REQUIREMENTS:
Must be used with an equal or greater amount of soffit vent.
NOTE: Roll
Vent Cedar is not recommended for ridge beam applications. Roll Vent Cedar
must be installed on roofs with a minimum of 3/12 pitch (14°) and
a maximum pitch of 12/12 (45°).
|
|
|
|
|
|
|
|
|
|
|
|
Step
1: Snap
chalk lines and cut slot 2" wide (1" on each side). Allow for
a closed area of sheathing with no slot approximately 12" at both ends
of ridge. |
|

|
|
|
|
|
|
|
|
Step 2:
Fold 30 lb.
felt back over last course of shingles or shakes exposing 2" slot.
(When cutting last course of shakes or shingles, use caution to avoid cutting
through felt.) |
|
|

|
|
|
|
|
|
|
|
Step 3: Loosen about 2 of
black nylon matrix from black fabric and cut out with snips. Create end
cap by folding fabric in at each side; then up and over black nylon matrix.
Center Roll Vent over slot and fasten with NAIL LINES UP. Nail on nailing
line. |
|
|

|
|
|
|
|
|
|
|
Step 4:
To splice, remove 2 of nylon matrix and fit together by overlapping
remaining fabric with next section and fasten to roof deck. |
|
|

|
|
|
|
|
Step 5:
Cut exposed excess felt away on shingles. In areas of severe weather
or rough hand split shakes, lay a bead of caulk between felt and Roll Vent
1/4" in from edge for entire length of Roll Vent. |
|
|

|
|
|
|
|
Step 6:
Install 30 lb. felt 7" wide on top of entire length of Roll Vent. |
|
|

|
|
|
|
|
Step 7:
Install Ridge caps with even spacing on both sides of Roll Vent using
2 1/2" shake nails. Nail approximately 1 3/4" in from cap shingle
edge on nailing rib indicated by nailing line. Nails should penetrate into
the sheathing 3/4" or completely through sheathing. Ridge Cap must
overhang Roll Vent by 1" at each gable end. Ridge cap shingles should
overhang Roll Vent by a 1/4" minimum on each side. |
|
|
|
|
 |
|
|
|
|
|
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|